🚀 Takeoffs that took 4 to 8 hours now finish in under 20 minutes. Start your free trial

Our technology

Watch it against a manual takeoff

Takeoff Time
Manual
8 hours
with Monaro
4 hours
No two firms draft a set the same way.Column orders differ. One firm splits an equipment type across several tables, another buries capacities in a footnote, a third tags equipment in a way that only makes sense beside its own legend. We have spent over a thousand hours with estimators and engineers, across more than 550 real mechanical documents, teaching our models to read those conventions rather than assume one.
+1000
Hours with estimators and engineers
+550
Mechanical documents reviewed
6 months
Inside bid desks before we built
Flagged, never guessed
No system reads drawings perfectly, and anyone claiming otherwise is selling something. Where an item is ambiguous Monaro flags it for a person rather than guessing, so your team reviews the exceptions instead of recounting the set.
85%
Come build with us
We are hiring AI engineers, product people, and HVAC subject matter experts. If you have run a distributor bid desk, we want to talk to you.
Get in touch
It reads everything on the schedule. These are just some of the categories.
Split Systems, Heat Pumps & VRF
Packaged & Rooftop
Air Handlers & Recovery
Heating
Pumps & Hydronic
Cooling
Air Distribution
Controls